KERRY Fine Gael TD, Brendan Griffin, has today (Tuesday) welcomed almost €200,000 in funding from the Department of the Marine for the repair and maintenance of Kerry Piers.

KERRY Fine Gael TD, Brendan Griffin, has today (Tuesday) welcomed almost €200,000 in funding from the Department of the Marine for the repair and maintenance of Kerry Piers.
The funding represents 75% of the estimated project costs and the other 25% will be spent by Kerry County Council. The bulk of the €200,000 grant aid will be spent on Renard Pier and Brandon Pier, two piers that Deputy Griffin has been strongly lobbying on.
At Renard, €112,500 is being allocated towards pier stabilisation. The funding will allow for the construction of a retaining cap around the top of the sheet pile to prevent further spread of the sheet piles and stabilise the pier for subsequent rehabilitation works. The total estimated value of this job is €150,000.
At Brandon, €60,000 is being allocated towards structural evaluation and the completion of infill grouting to the pier core to fill voids. The total estimated value of this job is €80,000.
A further €27,000 is allocated to eight other piers in the county (see below).
Deputy Griffin said:
“This funding, particularly the funding for Renard and Brandon is very welcome. I have lobbied Minister Simon Coveney strongly for this and I am glad that it has been granted. Hopefully we will see more for these and other piers in the future to help sustain and create jobs and economic activity in the marine sector in Kerry.”
Full list below.
Contact Brendan on 087-6528841 for further info.

Appendix A.
PROPOSED PROJECTS FOR INCLUSION IN THE 2014 FISHERY HARBOUR & COASTAL INFRASTRUCTURE DEVELOPMENT PROGRAMME
2014 Harbour Development Scheme & Marine Leisure & Marine Tourism Scheme
County
Location Project Description
Harbour Development Scheme (100% Project Cost)
Marine Leisure & Marine Tourism (100% Project Cost)
DAFM Portion Project Cost 2014
Cork City Council
Blackrock Harbour Redevelopment Installation of tiered steps from the Harbour Square into harbour with harbour deepening, paving, steps, railings, mooring points etc.
€300,000
€187,500
Cork City Council Total
€0
€300,000
€187,500
Donegal
Burtonport Repairs to quay wall
€100,000
€75,000
Greencastle Repairs to quay wall
€150,000
€112,500
Greencastle Deploy 90m of pontoons and 60m of floating breakwater
€200,000
€137,500
Rannagh Pier Construct sea wall to connect boat yard wall to pier wall and prevent waves washing across the pier and boat yard deck
€25,000
€18,750
Curransport slipway Erect 2 No. public lights at slipway to enhance safety for night time landings
€10,000
€7,500
Lugnadruan Concrete deck adjacent to pier
€10,000
€7,500
Inishbofin Island Install winch at top of existing slipway to enable the haulage of boats for storage
€30,000
€22,500
Teelin Pier Provision of pontoon and access gangway to facilitate transport of visitors to view cliffs at Slieve League
€80,000
€60,000
Mountcharles Pier Provision of pontoon and access gangway to facilitate rowing events. Provision of fenders at side of slipway for rowing skiffs and provision of steel stairs for accessing shore from the pier
€100,000
€75,000
Donegal Co. Co Total
€325,000
€380,000
€516,250
Mayo
Newport Quay Repair sea walls
€150,000
€112,500
Bundorragha Widen & extend existing pier & construct new slipway
€150,000
€112,500
Ballina Area
Killala Harbour Further repair to harbour deck and slipway. Repair defective/undermined section of main Pier
€150,000
€112,500
Ballina Harbour Repairs to harbour deck and walls
€150,000
€112,500
Killerduff Harbour Improvements to slipway and Quay wall
€120,000
€90,000
Mayo Co. Co. Total
€720,000
€0
€540,000

 

Kerry
Renard Pier Phase 1 – Pier stabilisation. Construct a retaining cap around the top of the sheet pile to prevent further spread of the sheet piles and stabilise the pier for subsequent rehabilitation works
€150,000
€112,500
Brandon Pier Structural evaluation and the completion of infill grouting to the pier core to fill the voids
€80,000
€60,000
Dromatoor pier Construct pier sea wall to protect the inner harbour area from wave over-topping
€10,000
€7,500
Cahersiveen Pier Repair breakwater by placing concrete filled sandbags into position and fixing them in place with steel pins
€7,500
€5,625
The Glen Pier Over-decking to slip area and installation of handrails
€4,500
€3,375
Rossdohan Pier Removal of siltation to keep channel free for use
€3,000
€2,250
Blackwater Pier Installation of additional mooring rings and breaking out of rock outcrop near the bottom of the slipway to facilitate easier launch and retrieval of boats
€2,500
€1,875
Oysterbed pier Installation of toe railing around the perimeter of the deck and on old pier area
€3,500
€2,625
Cornagillagh Removal of built up sediment around the pier area and berthing faces
€1,000
€750
Kenmare Pier Installation of LED safety lighting to pier deck following stabilisation works in 2011
€3,500
€2,625
Kerry Co. Co. Total
€265,500
€0
€199,125
Cork
Repairs to Glengarriff Pier Pontoon Replacement of worn and damaged floats
€19,000
€14,250
Baltimore Pontoon Installation of pontoon
€90,000
€67,500
Adrigole Pier, Installation of Leisure Pontoon Purchase & Installation of leisure pontoon
€200,000
€137,500
Durrus Pier Upgrade Upgrading of pier including new toe rails, mooring rings, improved lighting, signage & seating.
€30,000
€22,500
Passage Pontoon Phase 1 Purchase of pontoon
€100,000
€75,000
Ballycotton Pontoon – purchase & installation of a pontoon units Installation of marine leisure pontoon.
€150,000
€112,500
Cork Co. Co. Total
€30,000
€559,000
€429,250
Waterford
Passage East, East Harbour Replacement of structurally compromised above-ground harbour walls
€150,000
€112,500
Passage East, West Harbour Replacement of structurally compromised above-ground harbour walls
€150,000
€112,500
Tramore Pier Carry out repairs to harbour structure
€100,000
€75,000
Waterford Co. Co. Total
€400,000
€0
€300,000
Fingal
Loughshinny Harbour Removal of existing steps on outer harbour and replace with ladder access
€15,000
€11,250
Fingal Co. Co. Total
€15,000
€0
€11,250
Louth
Clogherhead Harbour Water Utilities
€7,000
€5,250
Annagassan Harbour Dredging Works
€12,000
€9,000
Clogherhead Harbour Navigation Lights
€3,000
€2,250
Clogherhead Harbour Wall Fender Protection
€85,000
€63,750
Louth Co. Co. Total
€107,000
€80,250

 

Wexford
Duncannon Harbour 1 Emergency repair works to old pier
€150,000
€112,500
Kilmore Quay Harbour 1 Repairs to harbour walls including repointing, structural cracking repairs, mooring repairs, Health & Safety & Access works
€50,000
€37,500
Duncannon Harbour 2 Resurface Main Pier, Underground Public Lighting Cables and New Mains Water Supply
€150,000
€112,500
Kilmore Quay Harbour 3 Marina walkway and pontoon repair works. Health & safety & access works
€60,000
€45,000
Wexford Co. Co. Total
■Ç350,000
€60,000
€307,500
Wicklow
Arklow Harbour, Remedial works to existing channel gate At the existing channel connecting the Dock to the Avoca River a new winch and motor is required to lift the channel gate out of the water.
€18,000
€13,500
Arklow Harbour, Dredging to provide improved drafts for Yachts In the Avoca river, upstream of the commercial shipping area, it is proposed to dredge 6,000 cubic metres from area of the river where yachts are moored.
€120,000
€90,000
Arklow Harbour, Pontoon mooring facilities Procurement and placing of pontoons in the dock area to provide additional mooring berths for visiting yachts.
€120,000
€90,000
Wicklow Co. Co. Total
€18,000
€240,000
€193,500
Galway
Cé Glinsk ,Carna Construct extension to existing pier structure. Include for construction of access ladders, new splash wall
€150,000
€112,500
Cé Lettercallow, Lettercallow Safety improvement works to pier and installing public lighting to assist fishermen and other users of this pier
€150,000
€112,500
Galway Co. Co. Total
€300,000
€0
€225,000
(100% project cost)
(100% project cost)
(DAFM %)
GRAND TOTAL
€2,530,500
€1,539,000
€2,989,625